Line 20 (São Paulo Metro)

São Paulo Metro Line 20 (Pink)
São Paulo Metro logo
Overview
StatusProposed
OwnerGovernment of the State of São Paulo
Locale
Termini
Connecting lines
Stations24 proposed
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) CMSP
Depot(s)Santa Marina rail yard[1]
Rhodia rail yard[1]
Rolling stock50 trains[2]
Daily ridership>1,000,000 (estimated)[2]
History
Planned opening2039 (estimated)[3]
Technical
Line length33 km (21 mi) (estimated)[4]
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge[5]
Electrification1,5 kV DC catenary[5]
Route map

Santa Marina
Line 6 (São Paulo Metro)
Santa Marina rail yard
Lapa
Vila Romana
Cerro Corá
Line 2 (São Paulo Metro)
Girassol
Teodoro Sampaio
 16 
 16 
Fradique Coutinho
Line 4 (São Paulo Metro)
Tabapuã
Jesuino Cardoso
Hélio Pellegrino
Moema
Line 5 (São Paulo Metro)
Rubem Berta
Indianópolis
Saúde–Ultrafarma
Line 1 (São Paulo Metro)
Abraão de Morais
Cursino
Arlindo Vieira
Liviero
Taboão-Paulicéia
Rudge Ramos
Afonsina
Príncipe de Gales
Portugal
Santo André
Rhodia rail yard

Line 20 (Pink) (Portuguese: Linha 20–Rosa) is a planned line of São Paulo Metro.[6][7]

At 31 kilometres (19 mi) in length, the line will serve as the first line of the future Subway Ring (Portuguese: Metroanel), which will include Line 5-Lilac (Moema ↔ Chácara Klabin stretch), the extension of Line 2-Green to station Dutra, and future Line 23-Magenta (Lapa ↔ Dutra).[8]

Stations

Code Station Platforms Position Connections Municipality
TBA Santa Marina Side platforms Underground Line 6 (São Paulo Metro) (Future) São Paulo
Lapa
Vila Romana
Cerro Corá Line 2 (São Paulo Metro) (Planned)
Girassol
Teodoro Sampaio  16  (Planned)
Fradique Coutinho Line 4 (São Paulo Metro)
Tabapuã
Jesuino Cardoso
Hélio Pellegrino  19  (Planned)
Moema Line 5 (São Paulo Metro)
Rubem Berta
Indianópolis
Saúde–Ultrafarma Line 1 (São Paulo Metro)
Abraão de Morais
Cursino
Arlindo Vieira
Liviero
Taboão–Paulicéia São Bernardo do Campo
Rudge Ramos
Afonsina BRT ABC (Future)
Príncipe de Gales Santo André
Portugal
Prefeito Celso Daniel–Santo André
Touristic Express
East Santo André Metropolitan Terminal
West Santo André Metropolitan Terminal
São Mateus–Jabaquara Metropolitan Corridor

References

  1. ^ a b Lobo, Renato (18 September 2023). "Membros de consórcio do ABC querem recursos para a Linha 20-Rosa do Metrô". Via Trólebus (in Brazilian Portuguese). Retrieved 18 September 2023.
  2. ^ a b Lobo, Renato (6 June 2020). "Linha 20-Rosa do Metrô entre o ABC e a Lapa terá licitação do anteprojeto funcional" (in Portuguese). Via Trólebus. Retrieved 8 June 2020.
  3. ^ Lobo, Renato (25 March 2022). "Relatório prevê conclusão da Linha 20 do Metrô em 2039". Via Trólebus (in Portuguese). Retrieved 31 March 2022.
  4. ^ Meier, Ricardo (6 June 2020). "Metrô lança primeira licitação da Linha 20-Rosa" (in Portuguese). Metrô CPTM. Retrieved 6 June 2020.
  5. ^ a b Lobo, Renato (14 September 2023). "Documento revela detalhes de trens da Linha 20-Rosa do Metrô". Via Trólebus (in Brazilian Portuguese). Retrieved 14 September 2023.
  6. ^ Priscila, Dayane (10 April 2019). "Linhas 20-Rosa e 22-Bordô podem abrir as portas em 2028, diz relatório" (in Portuguese). Noticiando. Retrieved 23 December 2019.
  7. ^ Meier, Ricardo (13 July 2019). "Entenda a real situação da Linha 20-Rosa de metrô" (in Portuguese). Metrô CPTM. Retrieved 23 December 2019.
  8. ^ Lobo, Renato (14 December 2013). "Futuras linhas do Metrô SP e CPTM: Linha 23 Magente e o metroanel" (in Portuguese). Via Trólebus. Retrieved 23 December 2019.